I have been asked by one lovely donor, and one lovely family member to include a photograph of my face mozaic. So here it is- patchy or otherwise, I'll do my best to update the growth soon.
On another note. The building at Chelsea has come a very long way since the last pictures were put up here. I don't have any recent pics to add but again, I will try to remember to take my camera to work on Monday.
All the framing has been plastered. The renderer has patched all areas downstairs. The plaster is all sanded and the painters have put a first coat on most surfaces. The kitchen has been placed and is currently being developed (as the door profile has been changed). The marble benchtops are being made. The hardwood staircase is nearly finished. The bathrooms are being tiled. What else... the Flooring is finished and is being sanded in about 10 days time. The skirting and arcs are very nearly finished. Repair to the old skirting downstairs is proving very time consuming with a lot of glueing and disguise techniques being utilised!
I have learnt on this job that it is actually considerably more expensive to retain old doors/fittings/jambs/skirting etc. than it would be to replace it all with new stuff. I guess that is the nature of modern consumption though.
I am really looking forward to a couple of weeks at home this January. I am looking up flights at the moment but hope to come over from about the 27th for two ish weeks.
peace,
Joff
